In this study we consider a Mars surface mission of ~500 days with a crew of 4, living in a habitat of about 1200 ft2 interior floor area. The study served as the foundation for Offworld Habitat Wall Section commissioned by Powerhouse.

In this study we consider a Mars surface mission of ~500 days with a crew of 4, living in a habitat of about 1200 ft2 interior floor area. The study served as the foundation for Offworld Habitat Wall Section commissioned by Powerhouse.

In this study we consider a Mars surface mission of ~500 days with a crew of 4, living in a habitat of about 1200 ft2 interior floor area. The study served as the foundation for Offworld Habitat Wall Section commissioned by Powerhouse.

CON-OPS coming soon

CON-OPS coming soon

KEY ASSUMPTIONS

KEY ASSUMPTIONS

KEY ASSUMPTIONS

Mission
and Context

Mission
and Context

  • Habitat will be constructed autonomously in 2075–80

  • It likely may not be the first habitat on Mars; but could viably be the first 100% ISRU-constructed habitat

  • Infrastructure will be available on the surface

  • Habitat will be constructed autonomously in 2075–80

  • It likely may not be the first habitat on Mars; but could viably be the first 100% ISRU-constructed habitat

  • Infrastructure will be available on the surface

NO CREW

No Habitats, Only Rovers and Robots

2025

2035

2045

2055

6 CREW

First Long Stay

Few Habitats, Class 1
Unpressurized Class 3 structures

2065

2075

20-30 CREW

Habitat District ?
Class 1, 2 & 3

2025

NO CREW

No Habitats, Only Rovers and Robots

2035

2045

6 CREW

First Long Stay

Few Habitats, Class 1

Unpressurized Class 3 structures

2065

2075

20-30 CREW

Habitat District ?

Class 1, 2 & 3

SITE SELECTION & RESOURCE UTILIZATION

SITE SELECTION & RESOURCE UTILIZATION

SITE SELECTION & RESOURCE UTILIZATION

To select a site for the habitat, consideration was given to regolith constructability and composition; accessibility of resources such as water-ice, metallics, carbonaceous species, and rare earth minerals; proximity to scientific sites of interest; solar availability; and topography, especially as it pertains to ease of construction, launch/landing, and traversal.

01/03

Mars regional resource map
Erebus Montes and Arcadia Planitia survey map
Erebus Montes construction site

To select a site for the habitat, consideration was given to regolith constructability and composition; accessibility of resources such as water-ice, metallics, carbonaceous species, and rare earth minerals; proximity to scientific sites of interest; solar availability; and topography, especially as it pertains to ease of construction, launch/landing, and traversal.

Mars regional resource map
Erebus Montes and Arcadia Planitia survey map
Erebus Montes construction site

HABITAT CONSTRUCTION & WALL SYSTEM

HABITAT CONSTRUCTION & WALL SYSTEM

HABITAT CONSTRUCTION & WALL SYSTEM

The habitat is conceived as two structurally distinct but coordinated systems. First an ISRU shell acting as a compression-dominant shielding structure, and second the interior inflatable—which remains the primary pressure boundary for the habitat.

The habitat is conceived as two structurally distinct but coordinated systems. First an ISRU shell acting as a compression-dominant shielding structure, and second the interior inflatable—which remains the primary pressure boundary for the habitat.

The site undergoes multiple stages of construction, increasingly expanding the number of modules as crewed missions increase in size and frequency.

The site undergoes multiple stages of construction, increasingly expanding the number of modules as crewed missions increase in size and frequency.

Section diagram of the inflatable collar and regolith shell

Collar of inflatable / regolith shell

Collar of inflatable / regolith shell

Collar of inflatable / regolith shell

Collar of inflatable / regolith shell

Robotic site preparation on the Martian surface

Site preparation

Site preparation

Site preparation

Site preparation

Autonomous rovers 3D printing the regolith shell

Shell construction

Shell construction

Shell construction

Shell construction

Once the interior habitat module is deployed it connects directly with the integrated transition nodes within the regolith shell. An adjustable connection point using capture channels creates the sealed point of transition between the inflatable bulkhead and the transition node bulkhead. Site ISRU processes feed into identified utility ports on the exteriormost bulkhead of the habitat module. Utility lines can be pre-outfitted in more rigid and permanent alignments within the transition module, running along the walls for access in need of maintenance.

Once the interior habitat module is deployed it connects directly with the integrated transition nodes within the regolith shell. An adjustable connection point using capture channels creates the sealed point of transition between the inflatable bulkhead and the transition node bulkhead. Site ISRU processes feed into identified utility ports on the exteriormost bulkhead of the habitat module. Utility lines can be pre-outfitted in more rigid and permanent alignments within the transition module, running along the walls for access in need of maintenance.

Transition node utility routing diagram
Cutaway of the inflatable airlock, shell transition node and inflatable habitat

HABITAT DESIGN

HABITAT DESIGN

HABITAT DESIGN

The site would undergo multiple stages of construction, increasingly expanding the number of modules as crewed missions increase in size and frequency. Autonomous construction rovers and robotics will conduct a majority of the construction over time, with crew available remotely or on-site at various stages to ensure the integrity and safety of the completed modules before habitation.

The site would undergo multiple stages of construction, increasingly expanding the number of modules as crewed missions increase in size and frequency. Autonomous construction rovers and robotics will conduct a majority of the construction over time, with crew available remotely or on-site at various stages to ensure the integrity and safety of the completed modules before habitation.

Plan of the habitat module inside the regolith shell
Site plan of the habitat district modules

Modules 2, 2A & 2B introduce an annulus program space within the module shell forms, utilized as a semi-pressurized work environment for equipment repairs, research experiments and non-essential storage that is protected from harsh surface conditions.

Modules 2, 2A & 2B introduce an annulus program space within the module shell forms, utilized as a semi-pressurized work environment for equipment repairs, research experiments and non-essential storage that is protected from harsh surface conditions.

Module 1, 2, 2A and 2B plan diagrams
Habitat interior galley and crew work area
Crew quarters inside the habitat
Habitat interior dome with skylight

HABITAT INTERIOR

01/03

Habitat interior galley and crew work area
Crew quarters inside the habitat
Habitat interior dome with skylight

HABITAT INTERIOR

01/03

Habitat interior galley and crew work area
Crew quarters inside the habitat
Habitat interior dome with skylight

HABITAT INTERIOR

01/03

PROJECT CONOPS

PROJECT CONOPS

PROJECT CONOPS

READ THE COMPLETE PROJECT CONCEPT OF OPERATIONS

READ THE COMPLETE PROJECT CONCEPT OF OPERATIONS

READ THE COMPLETE PROJECT CONCEPT OF OPERATIONS

COMING SOON

CREDITS

CREDITS

CREDITS

2075 Mars Habitat Design Concept. Commissioned by Powerhouse for Task Eternal, AENARA 2025-6

2075 Mars Habitat Design Concept. Commissioned by Powerhouse for Task Eternal, AENARA 2025-6

Architectural Design

Melodie Yashar, Mariam Alothman, Caden Savage, Pingting Li

Melodie Yashar, Mariam Alothman, Caden Savage, Pingting Li

Material Concept and Engineering

Andrea Jean Hoe, Ashley Li, Mira Schubert

Andrea Jean Hoe, Ashley Li, Mira Schubert

Computational Design

Melodie Yashar, Mariam Alothman, Caden Savage, Pingting Li

Melodie Yashar, Mariam Alothman, Caden Savage, Pingting Li

Systems Engineering

Aleigha Morgan, Takaharu Igarashi, Daniel Case, Eric Cremer

Aleigha Morgan, Takaharu Igarashi, Daniel Case, Eric Cremer

Civil Engineering and Integration

Matthew Troemner of North Fracture

Matthew Troemner of North Fracture

Structural Engineering

Nous Engineering

Nous Engineering

Production

Jim Zhong, Nishant Gaurav, Khanh Ngo

Jim Zhong, Nishant Gaurav, Khanh Ngo

Advisors

Haym Benaroya, Michael Fiske, Tracie Prater

Haym Benaroya, Michael Fiske, Tracie Prater